Wednesday, May 7, 2008
Wednesday 7th May
Today I finished editing my footage into shorter clips and sequences and then compiled all the sequences in order. As expected, the outcome of what was to be my doco came out a little longer than the allocated time limit. 7 mins 42 secs so therefore I had to cut 2 mins 42 secs out. Which wasnt as hard as I had thought it was going to be because I realised areas could be and some needed to be cut down in length and that some footage wasnt even needed as my voice over didnt make any reference to it. Once I had got it down to 5 mins I then downloaded my audio footage and then deleted the video from it and exported them out into quicktime to turn them into proper audio files that I could simply drag and drop into the timeline where that information was needed. A long grueling process but I got it done.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment